top of page

FEATURED PROJECT

POTASH CONVEYOR GALLERY FLOOR REPLACEMENT

DYMARK Industries has been a PREFERRED CONTRACTOR to the potash mining industry over the past decade.  We have completed numerous gallery repair projects, but this one stands out due to the UNIQUE CHALLENGES that we overcame such as an accelerated project schedule, inclement weather (completed in January with temperatures falling below -35 deg C), and a broad scope of work including DEMOLITION, SCAFFOLDING complete with HOARDING and HEATING, MOBILE SANDBLASTING, new structural REINFORCING, structural REPAIRS, replacement of the entire steel checker plate floor and a complete sandblast and EPOXY PAINT job on the interior and exterior floor structure.  With the odds stacked against us, all of this work was completed ON TIME and ON BUDGET.

FEATURED PROJECT DETAILS:

  • Erect scaffolding, hoarding and heating equipment.

  • Demo and replace existing floor steel in sequence to maintain structural integrity of the gallery.

  • Examinations and repairs to existing structure.

  • Reinforce existing steel beams and support bent structure.

  • Sandblast and epoxy paint entire interior and exterior of gallery and bent support.

bottom of page